• BCS 4
  • DWH_construction-9
  • DWNW_PavilionGardens_Drone_Construction
  • BNE_TheDrive_Durham_Construction
  • Cane Hill Park 3

Trade Specifications

The following Trade Specifications must be read in conjunction with all other Contract documentation including; Tender Letter, Operating Procedures for All Contractors, Conditions of Contract for Works, Labour Only and Purchase Orders, General Construction Notes (England & Wales), Suppliers and Sub Contract Works - SLA and the Company's Occupational Safety, Health & Environmental Management System.

Our aim is to enable our sub-contractors and suppliers to access key Commercial information such as Terms & Conditions, Trade Specification, etc. online as soon as they are updated and revised. We hope that this will ensure that our supply chain is always fully informed as quickly as possible.

Whilst available online, this information is also available from the Commercial Departments at our Divisional offices and will form part of any contract we place (as set out in the Order).

As part of the integration work which is now underway, you will see changes being incorporated into these Trade Specifications, in the near future, to include Redrow Homes specifications. Currently, where the Barratt Homes and David Wilson Homes logo's exist, these Trade Specifications are only applicable to these brands of Barratt Redrow plc.

Please be aware that bogus web sites seeking fees for the chance of working with major contractors exist.

Jon Hayward
Commercial Director (Group)

tagged "Plot Groundworks"

Plot Groundworks

Revision AB 01.07.2024

Defective workmanship e) has been updated to instruct the contractor to carry out quality assurance checks of their own work including providing evidence to the Company for review. The specification also includes for the contractor to use the Company's IT system to complete and record appropriate QA checks including specific records as noted.

Section 3 has been updated to remove the reference to 3.6N and detailed working drawings.

The requirement for a concrete foundation and decorative stone for the install of ASHPs has been added.

Section 9 has been fully updated to include for the contractor's responsibilities when designing and constructing retaining walls.

Subsection 11.6 has been updated to clarify that the construction method for ground floor slab will be confirmed in the tender enquiry.

Subsection 13.16 has added the note that all plant utilised on site shall be compliant with Non-Road Mobile Machinery regulations, and any other air quality requirements that may be enforced locally.