The following Trade Specifications must be read in conjunction with all other Contract documentation including; Tender Letter, Operating Procedures for All Contractors, Conditions of Contract for Works, Labour Only and Purchase Orders, General Construction Notes (England & Wales), Suppliers and Sub Contract Works - SLA and the Company's Occupational Safety, Health & Environmental Management System.

Our aim is to enable our sub-contractors and suppliers to access key Commercial information such as Terms & Conditions, Trade Specification, etc. online as soon as they are updated and revised. We hope that this will ensure that our supply chain is always fully informed as quickly as possible.

Whilst available online, this information is also available from the Commercial Departments at our Divisional offices and will form part of any contract we place (as set out in the Order).

As part of the integration work which is now underway, you will see changes being incorporated into these Trade Specifications, in the near future, to include Redrow Homes specifications. Currently, where the Barratt Homes and David Wilson Homes logo's exist, these Trade Specifications are only applicable to these brands of Barratt Redrow plc.

Please be aware that bogus web sites seeking fees for the chance of working with major contractors exist.

Jon Hayward
Commercial Director (Group)

tagged "Electrical"

Electrical

Rev AT - 01.07.2024

The trade specification Governing documents section has been updated to ensure the contractor fully complies with the latest IET Regulations, Building Regulations, British Standards and third-party certification.

Following Technical Alert 65, a section regarding works for Smart Cylinders has been added, including RJ45 port requirements.

A requirement has been added that all ducting bends must be formed using rigid ducting.

Clarification has been added regarding extractor air flow testing requirements.

Smoke Detectors section has been updated to include that any systems must meet minimum required standards.

Specific drawing references have been removed from Subsection 21.3 which relates to sockets for Integrated Dishwashers.

Solar PV has been updated to note that DC cabling from the PV array to the plot's inverter should be provided with amounts coiled at each end for connection by the Solar PV Contractor.

An additional section, Emergency Lighting to Communal Areas, has been added. This includes the requirement of certification to be submitted by the contractor including details of the photometric data, in accordance with BS 5266-1.

Waste requirements have been updated.

Electrical Downlighter Installation

Barratt / David Wilson Homes Standard Drawing DB-SD09-003